Solar Frequently Asked Questions
Everything you need to know about rooftop solar systems, PM Surya Ghar subsidy procedures, capacity planning, warranties, and financing in Varanasi.
Q1.What is rooftop solar?
A rooftop solar system consists of solar photovoltaic (PV) panels installed on the roof of a residential or commercial building. These panels absorb sunlight and convert it into direct current (DC) electricity, which a solar inverter transforms into alternating current (AC) electricity to power household appliances or feed into the electricity grid.
Q2.What is the difference between on-grid, off-grid and hybrid solar?
An on-grid (grid-tied) solar system is connected directly to your local electricity grid (PVVNL in Varanasi) through a bi-directional net meter without battery storage; it is the most cost-effective and common residential option. An off-grid solar system uses a dedicated battery bank to store electricity independently of the power grid, ideal for areas with frequent long outages. A hybrid solar system combines grid connectivity with battery backup, providing power during outages while still enabling net-metering benefits.
Q3.Who is eligible for government solar subsidy?
Under current central initiatives such as the PM Surya Ghar: Muft Bijli Yojana, residential individual homeowners with an active domestic electricity connection and suitable rooftop ownership can apply for solar subsidies. Commercial, industrial, and agricultural connections are generally ineligible for residential capital subsidies. Final eligibility, technical feasibility, and subsidy allocation depend entirely on official verification through the National Portal and local DISCOM approvals; no vendor can guarantee approval.
Q4.What documents may be required for a subsidy application?
Common documents typically required during the National Portal registration and DISCOM feasibility process include: a recent electricity bill in the homeowner's name, applicant's Aadhaar card, proof of property/roof ownership, a canceled bank cheque or bank passbook copy for Direct Benefit Transfer (DBT) subsidy disbursement, and passport-size photographs. Exact requirements may vary according to current official DISCOM guidelines.
Q5.How do I determine the correct solar capacity?
Solar capacity depends on your average monthly electricity consumption (units in kWh) and available shadow-free rooftop space. For example, a household consuming around 250–350 units per month typically considers a 2 KW to 3 KW solar system. You can explore our interactive Solar Savings Estimator or review individual capacity guides from 2 KW to 10 KW to evaluate your requirements before requesting a physical site assessment.
Q6.How much rooftop space is required?
As a general industry rule of thumb, each 1 KW of standard crystalline solar capacity requires approximately 80 to 100 square feet of shadow-free rooftop area. For instance, a 3 KW system requires about 240–300 sq. ft., while a 5 KW system requires 400–500 sq. ft. Elevated mounting structures can also be installed to preserve usable terrace space below the panels.
Q7.How much does a solar system cost?
Solar installation pricing in Varanasi varies depending on total system capacity, panel technology (Monocrystalline Perc, TopCon, Bifacial), inverter specifications, mounting structure height, cabling distance, and roof complexity. Because every installation site has unique electrical and structural requirements, universal fixed prices are not applied. We provide transparent, itemized quotations following a physical site evaluation.
Q8.How does solar EMI work?
Solar loans are offered by leading public and private sector banks under green energy and priority sector lending programs. Homeowners can finance up to 80%–90% of the net system cost with tenures ranging from 3 to 10 years at competitive interest rates. You can use our Solar EMI Calculator to explore monthly payment estimates and understand repayment terms.
Q9.What warranty applies to panels and inverters?
Warranty terms depend entirely on the specific tier-1 equipment manufacturer and official product documentation. Typically, reputable solar panel manufacturers offer a 10 to 12-year product workmanship warranty and a 25 to 30-year linear performance warranty. Grid-tied inverters usually carry a 5 to 10-year manufacturer warranty. BANARAS SOLAR SOLUTIONS passes through all authentic manufacturer warranty certificates upon commissioning.
Q10.What maintenance does a solar system require?
Rooftop solar systems have no moving mechanical parts and require minimal routine maintenance. The primary requirement is periodic cleaning of panel surfaces with clean water every 2 to 3 weeks to prevent dust, soot, and bird droppings from reducing light absorption. Regular visual checks of cables, inverters, and earth connections help maintain optimal safety and performance.
Q11.How can I book a site survey?
You can schedule a comprehensive site survey in Varanasi by contacting BANARAS SOLAR SOLUTIONS directly via phone or WhatsApp. During the survey, our technician evaluates your roof's orientation, shading profile, structural strength, existing distribution board, and past electricity bills to recommend a tailored solar setup.
Q12.How can I contact BANARAS SOLAR SOLUTIONS?
You can reach BANARAS SOLAR SOLUTIONS by phone at +91 98893 81013 (Atul Mishra), +91 77538 93616 (Awdhesh Naryan), or +91 72752 50060. You can also chat with our consultation team on WhatsApp or visit our office at Govindpur, Gangapur Road, Rohaniya - DLW Road, Varanasi, Uttar Pradesh 221108.
Have a Question Not Answered Here?
Every rooftop installation has unique nuances. Speak directly with our solar consultation experts in Varanasi for site-specific guidance.
